Project: 
Brackish water desalination plant 120m3/d

 

Year: 2016


Location: Toledo


Scope of supply: design, manufacture and starting


Capacity: 120 m3/d


Final application: water treatment


Pre-treatment:
– Roughing filtration through filter bed
– Antifouling dosage
– Oxygen reducer dousing
– Microfiltration


Osmosis:
– 1 rack in two stages for 120 m3/d
– Displacement equipment and chemical cleaning


Auxiliary equipment:
– Pressure boosting power supply
– Storage tank of treated water
– Pressure boosting to the consumption point