Project: Brine Filtration 17.42 m3/h Year: 2022 Location: Villafranco del Guadiana (Spain) Scope of supply: Manufacture and supply. Capacity:
A selection of the most outstanding projects of Hidro-Water’s engineering department in the area of INDUSTRIAL FILTRATION.
Project: Brine Filtration 17.42 m3/h Year: 2022 Location: Villafranco del Guadiana (Spain) Scope of supply: Manufacture and supply. Capacity:
Project: Stainless Steel Filter Battery Year: 2021 Location: Cantabria, Spain Scope of supply: Manufacture and supply. Final application of water:
Project: Triplex filtration with Turbidex FTTX 1200 in container to supply a triple softner with regeneration of liquid brine in
Project: Use of rainwater from vials and roofs for process water Year: 2017 Location: Toledo, Spain Scope of supply:
Project: Duplex dechlorinator with active carbon Year: 2017 Location: Almería, Spain Scope of supply: Design and fabrication Capacity: 50 m3/h Final
Project: Duplex filtration with Turbidex Year: 2016 Location: Valencia, Spain Scope of supply: Design and fabrication Capacity: 80 m3/h
Project: Tertiary filtration with ultraviolet 8 m3/h Year: 2016 Location: Cadiz Scope of supply: Design and manufacture Capacity: 8 m3/h
Project: Arsenic removal 20 m3/h Year: 2016 Location: Chile Scope of supply: Design and manufacture Capacity: 20 m3/h Final
Project: Carbon filter 200 m3/h Year: 2012 Location: Carcaixent, Spain Scope of supply: Design, manufacture and commissioning. Capacity: 200 m3/h
Project: Carbon filter 450 m3/h Year: 2012 Location: Alzira, Spain Scope of supply: Design, manufacture and commissioning. Capacity: