Brackish water desalination plant 264m3/d

desaladora-de-agua-salobre-264m3d HIDRO WATER

Project:
Brackish water desalination plant 264 m3/d
 
Year: 2015

Location: Toledo

Scope: design, manufacturing, project management and commissioning.

Capacity: 264 m3/d

Final water application: processes

Pre-treatment:
– Roughing filtration by means of a filter bed.
– Iron and manganese removal equipment
– Antiscalant dosing
– Dosing of oxygen reducer
– Hydrochloric acid dosing
– Microfiltration

Osmosis:
– 1 two-stage rack for 264 m3/d
– Displacement and chemical cleaning equipment