Year: 2023
Location: Gerona (Spain)
Scope: Design, manufacture, site management and commissioning.
Capacity: 2400 m3/d by means of 2 Containers each with 2 osmosis systems of 25 m3/h. This means a production per container of 50 m3/h to achieve a total production of 100 m3/h. The osmosis treatment line is completed by a calcite bed remineralisation post-treatment to treat the 100 m3/h produced by the osmosis systems.
Final water application: Potabilisation of drinking water by reducing chlorides and sodium and increasing pH.
Source of water: Well water.
Description:
Pre-treatment
Reverse osmosis
Post-treatment