Project:
Year: 2014
Location: Angola
Scope of supply: Design and manufacture
Capacity: 168 m3/day
Final application of water: Human consumption
Water catchment:
– Well
Treatment:
– Pre-chlorination
– Filtration through bed filter
– Carbon filter
– Post-chlorination
– pH adjustment
Ancillary equipment:
– Feed water pumping system
– Pre-oxidation tank
– Treated water storage tank
– Recirculation pumping system
– Treated water pumping system