Project:
Ultrafiltration system with 2 lines of 12.5 m3/h each
Year: 2022
Location: Cáceres (Spain)
Scope: Design, manufacture and implementation.
Capacity: 2 lines of 300 m3/d; total 600 m3/d
Final water application: Reuse of wastewater from a food industry.
Source of water: Purified industrial wastewater.
Description:
Feed pumping
- 2 Treatment line feed pumping systems (1 per line)
Pre-treatment
- 2 Glass roughing filtration systems (1 per line)
- 2 Safety mesh filters (1 per line)
Ultrafiltration Rack
- A frame on which the ultrafiltration membranes of both lines are installed for a production per line of 300 m3/d; total 600 m3/d.
Blower
- 2 Blowers for airscouring (1 per line)
Maintenance and recovery cleaning system
- 2 maintenance and recovery cleaning tanks (1 per line)
- 2 maintenance and recovery cleaning pumping systems (1 per line)
- 2 Chlorine dosing systems (1 per line)
- 2 Acid dosing systems (1 per line)
- 2 Soda dosing systems (1 per line)