Year: 2024
Location: Tarragona (Spain)
Scope: Design, manufacturing and commissioning
Capacity: 480 m3/d treatment (20 m3/h)
End use of water: Greywater reuse and filter backwashing
Water source: Grey water and backwash water from swimming pool filters.
Description:
Feed pumping
- Pumping system for feed to treatment line
Pre-treatment
- Roughing filtration system using QUIMHIDRO CRISTAL WATER
- Pumping of backwashing glass filter
- Safety mesh filter
Ultrafiltration Rack
- A rack on which the ultrafiltration membranes are installed to treat 20 m3/h.
- Blower for the airscouring process
Maintenance and recovery cleaning system
- 1 Maintenance and recovery cleaning tank
- 1 Maintenance and recovery cleaning pumping system
- 1 Chlorine dosing system
- 1 Acid dosing system
- 1 Sosa dosing system